Provided the labour and some of the equipment required to complete all of the underground infrastructure construction for the project including the construction and installation of the following:
- Truck Chute
- Maintenance Facility
- Refuge Stations
- Continuous Manways
- Level and Borehole Piping
- Latrines
- Sumps
We also installed a welded 8” schedule 120 casing pipe from surface to 3800 Level as well as the two associated receiving stations.
Customer
Vale
Services Provided
- Contract Mining
- Electrical Installations
- Mechanical Installations
- Specialty Services
- Underground Construction