Phase 3 Infrastructure Project

CONSTRUCTION AND INSTALLATION:
  • Road Bed Grizzly
  • Truck Loading Grizzly
  • Truck Chute
  • Level Piping
  • Sandfill Casing and Service Borehole Lining
  • Messenger and associated electrical
  • Main Switchroom
  • Telephone Services
  • Pump Station
  • Refuge Station
  • Latrine
  • Level Ventilation

EXCAVATION AND INSTALLATION:
  • 305 FAR (24 feet diameter x 90 degree Ventilation Shaft) as well as the associated manway and ground support
  • Fully Lined Orepass for the above mentioned truck chute

Customer

Vale

Services Provided

  • Electrical Installations
  • Mechanical Installations
  • Mine Development
  • Specialty Services
  • Underground Construction